{"id":35710,"date":"2022-09-07T16:01:01","date_gmt":"2022-09-07T16:01:01","guid":{"rendered":"https:\/\/armstrongyregion.com.ar\/diario\/?p=35710"},"modified":"2022-09-07T16:01:03","modified_gmt":"2022-09-07T16:01:03","slug":"vialidad-nacional-finalizo-la-repavimentacion-de-la-autopista-entre-rosario-y-roldan","status":"publish","type":"post","link":"https:\/\/armstrongyregion.com.ar\/diario\/vialidad-nacional-finalizo-la-repavimentacion-de-la-autopista-entre-rosario-y-roldan\/","title":{"rendered":"Vialidad Nacional finaliz\u00f3 la repavimentaci\u00f3n de la autopista entre Rosario y Rold\u00e1n."},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"613\" height=\"408\" src=\"http:\/\/armstrongyregion.com.ar\/diario\/wp-content\/uploads\/2022\/09\/RN-9-AUT-ROS-CBA-FINALIZO-LA-REPAVIMENTACION-ROSARIO-ROLDAN-7-9-22....jpg\" alt=\"\" class=\"wp-image-35711\" srcset=\"https:\/\/armstrongyregion.com.ar\/diario\/wp-content\/uploads\/2022\/09\/RN-9-AUT-ROS-CBA-FINALIZO-LA-REPAVIMENTACION-ROSARIO-ROLDAN-7-9-22....jpg 613w, https:\/\/armstrongyregion.com.ar\/diario\/wp-content\/uploads\/2022\/09\/RN-9-AUT-ROS-CBA-FINALIZO-LA-REPAVIMENTACION-ROSARIO-ROLDAN-7-9-22...-300x200.jpg 300w\" sizes=\"auto, (max-width: 613px) 100vw, 613px\" \/><\/figure>\n\n\n\n<p>Bajo una inversi\u00f3n de $ 1.125 millones, el Ministerio de Obras P\u00fablicas de la Naci\u00f3n termin\u00f3 por intermedio de Vialidad Nacional la obra de recuperaci\u00f3n de la Autopista de Ruta Nacional N\u00ba 9 entre Rosario (RN A008) y Rold\u00e1n (RN A012). La repavimentaci\u00f3n abarc\u00f3 los 17 kil\u00f3metros del tramo, para ambos sentidos de circulaci\u00f3n.<\/p>\n\n\n\n<p>Las tareas finalizadas esta semana se completaron sobre cinco kil\u00f3metros entre Funes y Rold\u00e1n, en la mano hacia C\u00f3rdoba. Este trayecto hab\u00eda quedado pendiente de concluir por el vencimiento del plazo original de contrato. Sin embargo, Vialidad Nacional retom\u00f3 los trabajos a inicios de julio y alcanz\u00f3 su finalizaci\u00f3n dentro del nuevo lapso previsto. Vale aclarar que este sector quedar\u00e1 con una demarcaci\u00f3n provisoria hasta el pintado definitivo de los bordes de calzada y eje de la calzada, a ejecutar en breve.<\/p>\n\n\n\n<p>Las obras terminadas por el Gobierno Nacional incluyeron el fresado de deformaciones, el bacheo por sectores y la repavimentaci\u00f3n completa de ambos carriles. Los sectores recuperados se completaron con el recalce y consolidaci\u00f3n de las banquinas. En poco tiempo m\u00e1s, una vez cumplido el plazo de garant\u00eda por los trabajos realizados, Vialidad Nacional transferir\u00e1 el tramo entre Rosario y Rold\u00e1n de la Autopista de RN 9 a la concesionaria, como lo realizado tiempo atr\u00e1s en el trayecto entre Rold\u00e1n y Carcara\u00f1\u00e1, tambi\u00e9n repavimentado por el organismo nacional.<\/p>\n\n\n\n<p>Finalmente, cabe aclarar que las obras de acceso a la zona industrial de Funes, sobre el sentido de circulaci\u00f3n hacia Rosario, no forman parte de un contrato con Vialidad Nacional y son ejecutadas por empresas al servicio de terceros.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bajo una inversi\u00f3n de $ 1.125 millones, el Ministerio de Obras P\u00fablicas de la Naci\u00f3n termin\u00f3 por intermedio de Vialidad Nacional la obra de recuperaci\u00f3n de la Autopista de Ruta Nacional N\u00ba 9 entre Rosario (RN A008) y Rold\u00e1n (RN A012). La repavimentaci\u00f3n abarc\u00f3 los 17 kil\u00f3metros del tramo, para ambos sentidos de circulaci\u00f3n. Las <a href=\"https:\/\/armstrongyregion.com.ar\/diario\/vialidad-nacional-finalizo-la-repavimentacion-de-la-autopista-entre-rosario-y-roldan\/\" title=\"Read more\" >&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":35711,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"image","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"enabled":false},"version":2}},"categories":[8,1,2,7,3],"tags":[],"class_list":["post-35710","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","category-deliberando","category-diario-armstrong","category-locales","category-politica","category-region","post_format-post-format-image"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/armstrongyregion.com.ar\/diario\/wp-content\/uploads\/2022\/09\/RN-9-AUT-ROS-CBA-FINALIZO-LA-REPAVIMENTACION-ROSARIO-ROLDAN-7-9-22....jpg","jetpack_shortlink":"https:\/\/wp.me\/p62QDO-9hY","jetpack_sharing_enabled":true,"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/posts\/35710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/comments?post=35710"}],"version-history":[{"count":1,"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/posts\/35710\/revisions"}],"predecessor-version":[{"id":35712,"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/posts\/35710\/revisions\/35712"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/media\/35711"}],"wp:attachment":[{"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/media?parent=35710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/categories?post=35710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/armstrongyregion.com.ar\/diario\/wp-json\/wp\/v2\/tags?post=35710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}